The Westfield Centre

The Westfield Centre

The ALD Group were approached by Westfield as a result of completing works one of the earlier shop units direct for a client. At this point there were approximately 70 units to screed covering some 10,000m2.

The challenges on the contract included:

  • Achieving very quick drying times on the modified screed to allow for the quick application of floor coverings
  • Pumping in excess of 200m2 to the higher floors
  • Handling materials in a very confined space for distribution through the centre
  • Working on a congested site with numerous other trades
  • Out of hours working including Sundays and evenings

Project Details

  • Location: Derby
  • Client: The Westfield Centre
  • Services: Screeding